Mondelez (Kraft Foods)

Project completed in August 2016. The scope of work was to prep the existing epoxy floor system, patch and repair as needed throughout, removal of deteriorated flooring, pitching of floor to provide positive drainage followed by installation of ¼” thick epoxy flooring system with four inch cove base to desired texture. The area was 21,000 SF under strict time lines. We were given 7 days (during their plant shutdown) to complete the work which required us to staff two ten men crews working two shifts or 20 hours per day for 7 days to complete.

About

Epoxy Systems, LLC is a commercial and industrial flooring contractor specializing in epoxy floor coatings and wall systems, concrete restorations, and much more serving clients in the Mid-Atlantic and beyond for more than 30 years.