EPOXY 151 INSTRUCTIONS

INSTALLATION INSTRUCTIONS

  1. New concrete shall be brought to complete cure with no surface hardeners or curing agents.
  2. Old concrete shall be cleaned and prepared. Shotblast and/or diamond grinding is a preferred method.
  3. Mixing ratio (by volume) is:
  • 2 Parts Resin A
  • 1 Part Hardener B
  1. Resin and hardener are to be mixed for 30 seconds to one minute with a drill mixer.
  2. Our selected aggregate is added and blended in with the mixed resin (by weight).
  3. The material is troweled in place, by a trained applicator.
  4. Cure Times at 70℉:
  • 12 hours for foot traffic.
  • 24 hours for forklift traffic.
  • 4 days for complete cure and maximum chemical resistance.

Precautions
WARNING: Severe skin and eye irritants. Use protective clothing, gloves, and face shielding, along with creams, during mixing. Rinse off any material immediately. For further details, refer to material safety data sheets supplied with product. Cleanup can be done with toluene or xylene.

Maintenance
Regular scrubbing with detergents and water flushing is recommended for cleaning. If the surface is stained, scratched, or damaged, a renewed surface can be achieved with a roller coat of our epoxy coating.

Limited Warranty
Epoxy Systems, LLC warrants to the original purchaser of its products that such products are free from manufacturing defects. Our obligation under this warranty is limited solely to the original purchaser and to replace any product which may prove defective within one year of installation. In no event is Epoxy Systems, LLC liable for any consequential damages.
Share by: