Completed in 2006, this project was completed for the City of Richmond water treatment plant called “5 mile gates”. Scope included concrete surface repair, full concrete depth repair using polymer cements, pouring of new vertical concrete, rebar repair and replacement, and anti-corrosion epoxy coatings. All work was completed on scaffolding with the optimum safety considerations. The water flow was drastically reduced during this work which lasted almost two months.
Address:
6507 Old Warwick Road Richmond, VA 23225 United States
Business Hours:
Mon - Fri
-
Sat - Sun
Closed
Content, including images, displayed on this website is protected by copyright laws. Downloading, republication, retransmission or reproduction of content on this website is strictly prohibited. Terms of Use
| Privacy Policy